Phillips - Philips - 989803151771 - Diagnostic Upgrade Kit 12 - 15/16 Long Leads For Use With Ecg

Note: Please purchase based on product "Code". Images are provided by manufacturers and might not represent the product accurately.

You may also need

In Stock
Price:
$72.16
Sold By:
Each
Shipping Note:
Please Call to Verify Stock. Order before 11AM and get it within the next 1 to 3 business days.
Adding to cart… The item has been added

Product Specifications

Below are the key product attributes and specifications that provide detailed information about this item:

Brand: Philips
WHSXX: MCK

Product Overview

The Philips Diagnostic Upgrade Kit 12-15/16 Long Leads (Model: 989803151771) is designed for use with Philips ECG systems, providing enhanced diagnostic capabilities with extended lead lengths for improved flexibility during patient monitoring. This upgrade kit ensures reliable signal transmission, reducing interference for accurate ECG readings.

Features:
- Compatible with Philips ECG systems for seamless integration
- Long lead design (12-15/16) for greater patient positioning flexibility
- High-quality materials for durability and consistent performance
- Ensures clear signal transmission for precise diagnostic results
- Easy to install and use

Specifications:
- Model Number: 989803151771
- Lead Length: 12-15/16 inches (long leads)
- Intended Use: Diagnostic ECG monitoring
- Compatibility: Designed for Philips ECG systems

Use Suggestion:
Ideal for clinical settings where extended lead reach is needed, such as hospital bedsides or diagnostic labs. Ensures patient comfort while maintaining accurate ECG readings. Replace existing leads with this upgrade kit for improved performance and reliability.

Product Reviews

(No reviews yet) Write a Review